The new 400 square foot data processing equipment room is located in an existing IDF room. With limited foot print a mezzanine level was design to house the additional rack space. The arena is located in Newark, NJ and the system was completed in January 2012. FCArchitects provided the following services for the project:
- Preparation of construction documents
- Construction documents and specifications that meet the clients network standard specifications and building code compliance
- Processing equipment layout – racks and support devices
- Structural steel platform design and load calculations
- DC plant and distribution
- Grounding system design
- Secondary electric service load calculations and electrical distribution
- Associated coaxial cables and fiber components and wiring diagrams
Thornton Tomasetti provided structural engineering consulting services.